Cement Blocks

Cement Blocks


Cement Block Making: The concrete commonly used to make concrete Blocks is a mixture of powdered portland cement, water, sand and gravel. This produces a light gray block with a fine surface Texture and a high compressive Strength.

Cement Block Making Machines: CGM block Making machines are designed to make vibro-pressed hollow Blocks, interlocking Blocks, pavers, a variety of special products and custom made designs. CGM interchangeable moulds are designed to meet any customers need and specifications.


Standard concrete block: The concrete commonly used to make concrete Blocks is a mixture of powdered portland cement, water, sand, and gravel. This produces a light gray block with a fine surface Texture and a high compressive Strength. A typical concrete block weighs 38-43 lb.

Block Molding: There are other materials used for building Houses, concrete Blocks still remain the number one item used in construction. Many block molding, Making factories around, but I am sure you will not have a problem getting people to patronize you, if you distinguish yourself in the business by Making quality Blocks.


Give Advertisement: Put your service information in the books of directory Services, Give your service information in face book page. Put an advertising banner in centers, give web add also in social media. Then you will get good response. At the same time, do not spend too much on ads.

Raw Materials: The concrete commonly used to make concrete Blocks is a mixture of powdered portland cement, water, sand, and gravel. This produces a light gray block with a fine surface Texture and a high compressive Strength.


How many Blocks can be made from a bag of cement: 50 Blocks. 1 bag of cement produces 50 Blocks so let us do the calculation, 15 bags will produce 15 x 50 = 750 pieces of 6 inches Blocks.

What is the best mix for concrete Blocks: The standard mix for Concrete Blocks is 1:3:5, 1 part cement to 3 parts sand & 5 parts stone aggregate, by volume. 1 part cement to 8 parts mixed aggregate is much the same thing.


How do you make cement block bricks: Put the cement, sand, and gravel in the container at a ratio of 1:2:3. Start mixing water in the container and stir the mixture continuously with a rod. Pour water until the concrete mixture become pliable enough to pour in the mold.

How many bags of cement do I need for 1000 Blocks: 3 bags. To lay 1000 bricks = 3 bags cement + 0.6 cu. m. sand. 1 Bag of cement to 3 wheelbarrows of building sand.


How many bags of cement do I need for 100 Blocks: Mixed with sand in the proper 3 to 1 ratio will lay 40 twelve inch Blocks or 50 eight inch Blocks. So, if laying 8 inch block, you should be able to lay 100 Blocks with 2 bags of mortar.

What is the strongest concrete mix ratio: In making concrete strong, these ingredients should usually be mixed in a ratio of 1:2:3:0.5 to achieve maximum Strength. That is 1 part cement, 2 parts sand, 3 parts gravel, and 0.5 part water.


What is cement mix for concrete Blocks: The standard mix for Concrete Blocks is 1:3:5, 1 part cement to 3 parts sand & 5 parts stone aggregate, by volume. 1 part cement to 8 parts mixed aggregate is much the same thing. Note that the ratio is different by weight, since the ingredients don't have the same density.

How many Blocks will one bag of 50kg cement make: A bag of 50kg should give you around 715kg of concrete for Blocks. A standard block is around 15kg (for a typical use block. Foundations Blocks are heavier, corner Blocks are different and heavier, some Blocks are lightweight). So you should be just under 50 Blocks.


How do you make cement bricks manually: To make bricks from concrete, form a mold for the bricks using strips of plywood and lumber. Once you have built the mold, spray form release oil on the inside so the concrete does not stick to the wood. After that, mix the concrete in a wheelbarrow and shovel it into the mold.

How do you calculate cement and sand for a block: So the quantity of block work is 1sqm x 0.2 = 0.2cum. Quantity of Cement Mortar required is 11% to 16% of 0.2cum. Maximum mortar is required( 20% of the quantity of brick work ) while using small size bricks. Here we are using big size Blocks, so a minimum of 11% & maximum of 16% mortar required.


Is cement a mortar Code: The procedure for conducting chemical tests of hydraulic cement is covered in IS: 4032-1985*. 2.1 The samples of the cement shall be taken in accordance with the requirements of IS: 3535- 1986* and the relevant standard specification for the type of cement being tested.

How much mortar do I need for concrete block: Three bags of mortar are estimated for every 100 block, therefore 6-3/4 bags of mortar are needed ((225 block x 3 bags mortar) / 100 block = 6-3/4 bags of mortar).


Is Cement code tested: S: 3466 – specifications for masonry cement. IS: 4031 – chemical analysis and tests on cement. IS: 456; 10262; SP 23 – codes for designing concrete mixes. IS: 1199 – methods of sampling and analysis of concrete.